Pallet Flow Rack in Franklin, WI
In Franklin, Franklin Business Park operations can face food ingredients needing older lots released first. If that is the problem on your floor today, pallet flow rack should be compared against your actual inventory and building constraints before more space is leased.
Gravity lanes create a defined loading face and a separate discharge face so the first pallet received is presented first. Pallet condition, weight range and travel control determine whether that arrangement works. The lane must be tested with the real pallet, not just a catalog footprint. We compare depth with throughput so dated inventory does not sit behind a pick face that serves too little demand.
Why Franklin Warehouses Work With Us
Franklin Business Park and Loomis Business Park accommodate manufacturing and supply operations with different replenishment rhythms. Food inputs may need controlled rotation, while maintenance materials need access even when production is busy. Ryan Road provides a regional connection, but the building plan should keep inbound staging separate from picking and work-in-process. We compare storage choices against the inventory you actually hold through a production cycle, not only the average pallet count.
Here the first comparison is between pallet-level FIFO and rotation managed by separate dated lanes. True flow through racking needs access at both ends; it cannot be inserted into a floor plan without allowing for both aisles. We check pallet bottom boards, brakes, separation and loading patterns. A drawing of those working faces makes the tradeoff clear before rollers, frames or protection are ordered for your building.
Milwaukee Pallet Rack is your contact for Warehouse Equipment & Supplies Co. in Franklin. Request a free design consultation and an itemized proposal so layout choices and responsibilities are clear before work starts.


Operations We Plan Around Here
Service coverage includes Franklin Business Park, Loomis Business Park, Ryan Road.
How Pallet Flow Rack Works
Load one side, pick the other, and let gravity enforce first in, first out.
Load end
Pallets enter at the high end of the lane. Each new pallet stages behind the one before it, so put-away is a single move made from the load-side aisle.
Gravity conveyor
Full-width rollers or skate-wheel tracks, set on a pitch calculated for the pallet weight, carry loads forward under control rather than free rolling.
Braking and separation
Brake rollers and pallet separators regulate travel and stop pallets from bunching, protecting both the product and the structure underneath it.
Pick end
Pickers work a face of first-in pallets. Pull one and the next indexes forward automatically, so the pick aisle stays organized without anyone re-facing stock.
What a Pallet Flow Rack Project Includes
Flow racking is engineered per lane, not pulled off a shelf. Pallet weight, deck condition, bottom-board orientation, and desired lane depth all drive the roller or wheel selection and the pitch calculation, so the first step is pinning down exactly what's moving through the lane.
From there we set lane count and depth against your throughput. Fewer, deeper lanes maximize storage; more, shallower lanes give the pick face more SKU variety. Both versions get modeled with position counts so the tradeoff is visible before you buy, not found after.
The itemized quote covers frames, beams, rail and roller assemblies, brakes, entry and exit guides, and guarding. At installation the crew sets pitch, tests loaded travel in every lane, and tunes brakes before the system goes live.
Afterward you have documented capacities, a lane map your team can hand to new hires, and a local contact for brake rollers and wheels as the system racks up cycles.
Before scheduling the pallet flow rack project in Franklin, WI, we confirm the building access arrangements, unloading space and any review required for the proposed installation. The agreed scope distinguishes materials, installation and supporting services so you can compare proposals on the same basis. Send your drawings and current inventory profile to start that conversation.
Get a Pallet Flow Rack Quote for Your Franklin Warehouse
Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call (414) 260-3593.
Milwaukee Pallet Rack
7311 W Greenfield Ave.
Ste 316
Milwaukee, WI 53214
(414) 260-3593Monday - Friday: 8:00 AM - 6:00 PM
Pallet Flow Rack Questions We Hear Most
Other Rack Types We Supply in Franklin

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Drive-In Rack
No aisles. The forklift enters the structure, and the floor holds more pallets per square foot than any other system.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers southeastern Wisconsin, with scope and scheduling agreed for each building.
Where We Work
Located in Milwaukee, we serve the entire Milwaukee metro with industrial pallet racks and warehouse storage solutions.
Milwaukee Pallet Rack
Address
7311 W Greenfield Ave.
Ste 316
Milwaukee, WI 53214
Phone
(414) 260-3593Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Pallet Flow Rack in Franklin?
Call (414) 260-3593 or request a quote and we will get a layout started.









